- 1). Remove the shingles from their damp packaging material.
- 2). Separate the shingles and place them in a well-ventilated area. If you spread the shingles out outside, make sure there is no rain scheduled in the forecast.
- 3). Wait for two to three hours for the shingles to dry out. Check them periodically with your hands to see how quickly they are drying. Begin to install the shingles once they have dried completely.
previous post
next post